0:16 · 9:16 vertical
A walk through the assembly area. Brass components wait in trays, our own team fits and wires each piece at the bench, and the finished fixtures move on to the packing station.
Quality control happens here, at the bench and piece by piece, before anything reaches a carton. Then each fixture is wrapped, seated in its moulded insert and boxed for export.
If you are sourcing for a hotel project or building a range, send us the model, the finish and the quantity. We will come back with price, MOQ and lead time.
Samples ship in 5–7 days. Project quantities get a DIALux simulation at no cost.